You don't have javascript enabled. Good luck with that.
Pencarian
Saluran PHB Rawa Kerbau Dinormalisasi

Rawa Kerbau Connecting Channel Dredged

The ranks of Central Jakarta Water Resources Sub-dept. are dredging garbage and mud in the Rawa Kerbau connecting channel on Jalan Cempaka Putih Timur, Cempaka Putih Sub-district. 

It will take about two months. It is done to maximize the function of the channel

Section Head of Maintenance for Central Jakarta Water Resources Sub-dept., Boris Karlop Lumbangaol said dredging is carried out up to two kilometers. And mud is dredged from 50-100 centimeters.

"It will take about two months. It is done to maximize the function of the channel," he expressed, Monday (4/17).

Around 100 Tons of Trash Transported from Connecting Channel

In the field, his side has sent one mini-amphibious excavator and one long-arm excavator, as well as five dump trucks to the location.

"We do this at noon which aims not to disturb the people activities around the channel," he closed.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1128 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye839 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye290 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye288 personAldi Geri Lumban Tobing